Overhead Cranes and Rail Systems for One Customer

Mennens recently supplied a complete lifting solution for a customer’s range of operations. Two new double-girder overhead cranes replaced the existing cranes. Mennens also supplied four rail systems with electric chain hoists. Together, these solutions can lift loads ranging from 250 kilograms to 20 tonnes.

Double-Girder Overhead Cranes with a 23-Metre Span

The two double-girder overhead cranes have working load limits of 12 and 20 tonnes and a span of 23 metres. Frequency-controlled trolley and crane travel allow loads to be moved in a controlled way.

The cranes are equipped with Autec LK-NEO radio remote controls and seven lighting fixtures. Spring cable reels supply power to the vacuum lifters.

News image
News image

Rail Systems for Assembly Work

Alongside the overhead cranes, Mennens supplied four Verlinde rail systems, each 30 metres long. The systems include a total of 21 suspended bridge cranes, with different spans and working load limits ranging from 250 to 1,000 kilograms. Each crane has a Verlinde electric chain hoist for lifting during assembly work.

The rail systems are fitted with an internal conductor system to make good use of the available space and provide ample clearance.

Lifting Solutions Tailored to the Work

From precise assembly work to moving heavy loads, the combination of overhead cranes and rail systems suits the customer’s operations and available workspace. It brings together custom engineering, technology and safe working in one complete lifting solution.

Looking for a lifting solution that suits your work and workspace? Mennens is happy to help you find the right one.

Contact us